Submitted by amanda on Sat, 2014-11-01 00:12

13_costanalysis.jpg

Cost Estimates are typically prepared at both the schematic options phase, at the close of Schematic Design and at the close of Design Development. This information is useful in assessing the scope of the project before moving into working drawings.